My Construction diary that follows the Build and Initial Flight of Bristell Speedwing no. 790
Saturday, April 26, 2025
Main Undercarriage 2
Axles are removed and the Wheel pant bracket is captured behind the 4 bolt heads on the inside of the undercarriage leg.
Subscribe to:
Post Comments (Atom)
-
The water pump was stripped down before Xmas and the pipework reconfigured to fit around the engine frame. Now is the time to complete the...
-
At special request to a ship colleague on my most recent vessel, and in accordance with the Bristell Build Manual, a mild steel lifting brac...
-
The stainless steel elbow is inserted at the base of pipe AA1 and joins to the lower elbow before connecting to the water radiator.


No comments:
Post a Comment